question

Which Risk Management principle is best demonstrated by through hazard identification and assessment in order to prevent needlessly jeopardizing Marines and equipment?

answer

Accept no unnecessary risk.

question

The statement, "You are more likely to control risks when they are identified earlier rather than later" is associated with what Risk Management principle?

answer

Anticipate and manage risk by planning

question

LCpl Jones wants to drive to his hometown for liberty in his private motor vehicle (PMV). LCpl Jones determines that his PMV has worn tires, a winter storm is forecasted when he plans to drive, and he has duty the night before he leaves. Using the 5-step Risk Management Process, when should the LCpl do next to mitigate the risk?

answer

Assess and prioritize the hazards.

question

Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.

answer

Determining the greatest hazard to you relates with swimming at a new beach.

question

The time critical level of Risk Management applies when on-the-run decisions are needed at the beginning of or during the execution of a task or mission.

answer

time critical

question

In-depth and - levels of Risk Management are used when there is time to document the results of the planning.

answer

deliberate

question

In correct order, What Are the Steps in the ABCD Model?

answer

Assess, balance, communicate with others, and do and debrief the event.

question

Choose an example of a physical control.

answer

Wearing an approved Department of Transportation (DOT) helmet while riding a motorcycle.

question

First Sergeant Jones posts a sign outside the entrance to the maintenance shop indicating that hearing protection is required inside. This is an example of what type of risk control?

answer

Administrative

question

Which element is often present when human error exists in a mishap?

answer

Pressure to complete the mission.

question

to get to a remote village, you have to cross a wooden bridge that spans a deep chasm. concerned about the structural integrity of the bridge you halt and request aviation support through your chain-of-command to cross the gap. halting before crossing and requesting aviation support to cross the gap reflects which risk management principle?

answer

Accept no unnecessary risk.

question

Elevating the risk decision up the chain-of-command is part of when Risk Management principle?

answer

Make risk decisions at the right level.

question

Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.

answer

Determining the greatest hazard to you related with swimming at a new beach.

question

Select the activity listed below which is best associated with implementing the in-depth level of Risk Management.

answer

Developing new training curricula.

question

Your unit is on a security patrol during a stability operation. You come across a civilian female...Using the ABCD Model what would be the next step?

answer

Balance your resources

question

Choose an example of an engineering control.

answer

Designing and installing a ventilation system to reduce exposure to toxic fumes in a building.

question

Prioritize types of controls from most preferred too least preferred.

answer

Engineering , administrative, physical.

question

Identifying risks as early as possible is part of what Risk Management principle?

answer

Anticipate and manage risk by planning.

question

Taking a risk that will not contribute to the task or mission accomplishment or will needlessly jeopardize personnel or material goes against when Risk Management principle?

answer

Accept no unnecessary risk.

question

You are at the beach. Looking up, your see a sign that says, "Hazardous Marine Life. Swim at Your Own Risk." ...Based on Risk Management principles and using the Risk Management process, how would you approach the idea of going for a swim now?

answer

Evaluate the situation to determine if the wire fence physical control will have the desire effect of mitigating the hazard to an acceptable level.

question

Designing a quiet generator to reduce the amount of hazardous noise is an example of what type of risk control?

answer

Engineering

question

A(n) _______ is defined as any real or potential condition that can cause injury, illness, or death to personnel; damage to or loss of equipment or property; degradation of mission capability or impact to mission accomplishment; or damage to the environment.

answer

hazard

question

A battalion commander and here staff are conducting a Marine Corps Planning Process (MCPP) session to develop an operations order (OPORD) for an upcoming offensive operation. The operation begins in 96-hours. The MCPP session would fall under with Risk Management level?

answer

Deliberate

question

During the deliberate planning for an offensive operation, you observe that ht emission re3quires crossing a wide river with a swift current...This support request is an example of which type f risk control option?

answer

Compensate for the risk.

question

What causes the majority of all mishaps?

answer

Human error

question

If decisions need to be made in less than 60 seconds, what Risk Management tool should be used?

answer

ABCD Model

question

Weighing risks against benefits and value is an example of applying which of the following Risk Management principles?

answer

Accept risk when benefits outweigh the cost.

question

Pvt Thompson is directed to move a 24-foot metal extension ladder from the supply room to the barracks for a work detail the next day...Which type of control option did Pvt Thompson use to mitigate the risk of the Thunderstorm?

answer

Delay an action.

question

Which of the following depicts the 5-step Risk Management Process in the correct order?

answer

Identify, assess, make decisions, implement controls, supervise.

question

_________is best used when you have limited time and resources to develop a risk assessment, make decisions, and act.

answer

Time Critical Risk Management (TCRM)

question

According to the Make Risk Decision step of the 5-step Risk Management process, after you identify and assess control options, you next determine the__________.

answer

type of control

question

Select from the choices below the activity which is the best example of the deliberates level of Risk Management.

answer

Operations planning.

1 of 32

Unlock all answers in this set

Unlock answers (28)

question

Which Risk Management principle is best demonstrated by through hazard identification and assessment in order to prevent needlessly jeopardizing Marines and equipment?

answer

Accept no unnecessary risk.

question

The statement, "You are more likely to control risks when they are identified earlier rather than later" is associated with what Risk Management principle?

answer

Anticipate and manage risk by planning

question

LCpl Jones wants to drive to his hometown for liberty in his private motor vehicle (PMV). LCpl Jones determines that his PMV has worn tires, a winter storm is forecasted when he plans to drive, and he has duty the night before he leaves. Using the 5-step Risk Management Process, when should the LCpl do next to mitigate the risk?

answer

Assess and prioritize the hazards.

question

Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.

answer

Determining the greatest hazard to you relates with swimming at a new beach.

question

The time critical level of Risk Management applies when on-the-run decisions are needed at the beginning of or during the execution of a task or mission.

answer

time critical

question

In-depth and - levels of Risk Management are used when there is time to document the results of the planning.

answer

deliberate

question

In correct order, What Are the Steps in the ABCD Model?

answer

Assess, balance, communicate with others, and do and debrief the event.

question

Choose an example of a physical control.

answer

Wearing an approved Department of Transportation (DOT) helmet while riding a motorcycle.

question

First Sergeant Jones posts a sign outside the entrance to the maintenance shop indicating that hearing protection is required inside. This is an example of what type of risk control?

answer

Administrative

question

Which element is often present when human error exists in a mishap?

answer

Pressure to complete the mission.

question

to get to a remote village, you have to cross a wooden bridge that spans a deep chasm. concerned about the structural integrity of the bridge you halt and request aviation support through your chain-of-command to cross the gap. halting before crossing and requesting aviation support to cross the gap reflects which risk management principle?

answer

Accept no unnecessary risk.

question

Elevating the risk decision up the chain-of-command is part of when Risk Management principle?

answer

Make risk decisions at the right level.

question

Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.

answer

Determining the greatest hazard to you related with swimming at a new beach.

question

Select the activity listed below which is best associated with implementing the in-depth level of Risk Management.

answer

Developing new training curricula.

question

Your unit is on a security patrol during a stability operation. You come across a civilian female...Using the ABCD Model what would be the next step?

answer

Balance your resources

question

Choose an example of an engineering control.

answer

Designing and installing a ventilation system to reduce exposure to toxic fumes in a building.

question

Prioritize types of controls from most preferred too least preferred.

answer

Engineering , administrative, physical.

question

Identifying risks as early as possible is part of what Risk Management principle?

answer

Anticipate and manage risk by planning.

question

Taking a risk that will not contribute to the task or mission accomplishment or will needlessly jeopardize personnel or material goes against when Risk Management principle?

answer

Accept no unnecessary risk.

question

You are at the beach. Looking up, your see a sign that says, "Hazardous Marine Life. Swim at Your Own Risk." ...Based on Risk Management principles and using the Risk Management process, how would you approach the idea of going for a swim now?

answer

Evaluate the situation to determine if the wire fence physical control will have the desire effect of mitigating the hazard to an acceptable level.

question

Designing a quiet generator to reduce the amount of hazardous noise is an example of what type of risk control?

answer

Engineering

question

A(n) _______ is defined as any real or potential condition that can cause injury, illness, or death to personnel; damage to or loss of equipment or property; degradation of mission capability or impact to mission accomplishment; or damage to the environment.

answer

hazard

question

A battalion commander and here staff are conducting a Marine Corps Planning Process (MCPP) session to develop an operations order (OPORD) for an upcoming offensive operation. The operation begins in 96-hours. The MCPP session would fall under with Risk Management level?

answer

Deliberate

question

During the deliberate planning for an offensive operation, you observe that ht emission re3quires crossing a wide river with a swift current...This support request is an example of which type f risk control option?

answer

Compensate for the risk.

question

What causes the majority of all mishaps?

answer

Human error

question

If decisions need to be made in less than 60 seconds, what Risk Management tool should be used?

answer

ABCD Model

question

Weighing risks against benefits and value is an example of applying which of the following Risk Management principles?

answer

Accept risk when benefits outweigh the cost.

question

Pvt Thompson is directed to move a 24-foot metal extension ladder from the supply room to the barracks for a work detail the next day...Which type of control option did Pvt Thompson use to mitigate the risk of the Thunderstorm?

answer

Delay an action.

question

Which of the following depicts the 5-step Risk Management Process in the correct order?

answer

Identify, assess, make decisions, implement controls, supervise.

question

_________is best used when you have limited time and resources to develop a risk assessment, make decisions, and act.

answer

Time Critical Risk Management (TCRM)

question

According to the Make Risk Decision step of the 5-step Risk Management process, after you identify and assess control options, you next determine the__________.

answer

type of control

question

Select from the choices below the activity which is the best example of the deliberates level of Risk Management.

answer

Operations planning.

Risk Management for Small Unit Leaders Post-test - Quizzes Studymoose (2024)

FAQs

Which step in the risk management process requires that a unit develop one or more control options that will either avoid the hazard or reduce risk? ›

  • Identify. Hazards.
  • Assess. Hazards.
  • Develop. Controls/Make. Risk Decision.
  • Implement. Controls.
  • Supervise. and. Evaluate. ...
  • IDENTIFY HAZARDS. • ...
  • ASSESS HAZARDS TO DETERMINE RISK. Step 2 completes the risk assessment. ...
  • STEP 3 DEVELOP CONTROLS/ MAKE RISK DECISION. Step 3 is accomplished in two substeps: develop controls and make risk.

Which of the following is the correct order regarding the risk management process? ›

There are five basic steps that are taken to manage risk; these steps are referred to as the risk management process. It begins with identifying risks, goes on to analyze risks, then the risk is prioritized, a solution is implemented, and finally, the risk is monitored.

What is the deliberate level of risk management? ›

The deliberate level refers to situations when there is ample time to apply the RM process to the detailed planning of a mission or task. At this level, the planning primarily uses experienced personnel and brainstorming and is most effective when done in a group.

Are more likely to control risks when they are identified earlier rather than later? ›

Final answer: The statement "You are more likely to control risks when they are identified earlier rather than later" refers to the proactive risk management principle, which advocates for early risk identification and prevention to mitigate potential repercussions.

What are the three 3 key steps in the risk management process? ›

Risk management has three (3) main stages, risk identification, risk assessment and risk control.

What are the five 5 risk management steps for an effective risk management process? ›

We will also outline how to effectively implement and streamline each step in the workflow for maximum success.
  • Step 1: Identifying Risks. ...
  • Step 2: Risk Assessment. ...
  • Step 3: Prioritizing the Risks. ...
  • Step 4: Risk Mitigation. ...
  • Step 5: Monitoring the Results.

What is the most critical step in the risk management process? ›

Identifying risks is the most important part of the risk management process and has the biggest impact on the process. It is the first step in the process. If a risk is not identified it cannot be assessed or evaluated.

What are 5 risk management strategies? ›

There are five basic techniques of risk management:
  • Avoidance.
  • Retention.
  • Spreading.
  • Loss Prevention and Reduction.
  • Transfer (through Insurance and Contracts)

What are the 4 T's of risk management? ›

There are always several options for managing risk. A good way to summarise the different responses is with the 4Ts of risk management: tolerate, terminate, treat and transfer.

What is the 2 rule in risk management? ›

The 2% rule is a risk management principle that advises investors to limit the amount of capital they risk on any single trade or investment to no more than 2% of their total trading capital. This means that if a trade goes against them, the maximum loss incurred would be 2% of their total trading capital.

What are the four basic rules in risk management describe? ›

The 4 essential steps of the Risk Management Process are:

Identify the risk. Assess the risk. Treat the risk. Monitor and Report on the risk.

What is the most crucial phase in risk management cycle? ›

Risk identification is the critical first stage in the risk management lifecycle. In this phase, an organization recognizes potential threats that could adversely affect its ability to achieve its objectives.

Which is the most effective risk control strategy? ›

1. Eliminate hazards and risks. Highest level of protection and most effective control. Eliminating the hazard and the risk it creates is the most effective control measure.

What is the first step involved in risk management? ›

1. Identify risks. The first step in the risk management process is to determine the potential business risks your organization faces. That requires some context: To consider what could go wrong, one needs to begin with what must go right.

What is step 4 of the risk management process? ›

The 4 essential steps of the Risk Management Process are:

Identify the risk. Assess the risk. Treat the risk. Monitor and Report on the risk.

What is the 5 step process of risk assessment? ›

The five steps in risk assessment are identifying hazards in the workplace, identifying who might be harmed by the hazards, taking all reasonable steps to eliminate or reduce the risks, recording your findings, and reviewing and updating your risk assessment regularly.

What is the first step in the risk management process that helps to reduce the impact of threats and vulnerabilities? ›

1. Identify risks. The first step in the risk management process is to determine the potential business risks your organization faces. That requires some context: To consider what could go wrong, one needs to begin with what must go right.

What are the 5 steps of the Air Force risk management process? ›

(2) The five steps of the Air Force Risk Management process are: D) Identify hazards, analyze risk control measures, assess risk levels, make risk decisions, and plan risk avoidance.

References

Top Articles
Latest Posts
Article information

Author: Stevie Stamm

Last Updated:

Views: 6142

Rating: 5 / 5 (80 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Stevie Stamm

Birthday: 1996-06-22

Address: Apt. 419 4200 Sipes Estate, East Delmerview, WY 05617

Phone: +342332224300

Job: Future Advertising Analyst

Hobby: Leather crafting, Puzzles, Leather crafting, scrapbook, Urban exploration, Cabaret, Skateboarding

Introduction: My name is Stevie Stamm, I am a colorful, sparkling, splendid, vast, open, hilarious, tender person who loves writing and wants to share my knowledge and understanding with you.